Skip to content

Photo Tutorial: Insulating Basement Floor with PlastiSpan Insulation » Step 6

Secure the Sub-Floor. Be sure to stagger the sub floor joints for extra stability. Apply adhesive to the nailers. Fasten the 5/8” sub floor directly to the nailers using either ringed nails or deck screws every 8”. With an air nailer, use 2-inch ringed sub-floor or screw nails. With a screw gun, use 1-1/2” or 1-3/4” deck screws.

No comments yet

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s