Insulate Cathedral Ceilings with PlastiSpan® or DuroFoam® by Plasti-Fab

March 19, 2018

Insulation is important in a variety of areas in your home. It is what helps create the all important thermal envelope. This month we have really been focusing on roof insulation, and how it helps your home. A lot of insulation solutions are well suited or new construction, but today, we are going to talk about insulating a cathedral ceiling, which can be done during the new construction process OR as a renovation/improvement to your home.

The roof area can be the area of highest heat loss in buildings. In order to conserve energy and to make buildings more comfortable, building codes stipulate higher R-value  for the roof area compared to other building components. On traditional cathedral ceilings where tongue and groove timber is exposed on the inside and is used as an architectural feature, PlastiSpan or DuroFoam Insulation is ideal for both single and double layered applications.

Step 1: First layer of insulation
Use nailers the same thickness as the first layer of insulation. Starting at the bottom of the roof slope lay first row of nailers horizontally across the roof slope, then insulation working your way up the slope of the roof with all joints tightly butted. Fasten nailers to the roof deck as work proceeds.

Step 2: Second Layer of Insulation
Lay a second layer of insulation perpendicular to the first layer. Lay insulation with joints tightly butted. Lay nailers over insulation spaced to support roof sheathing.

Step 3: Fastening Layers of Insulation*
Fasten the second layer nailer to the first layer nailer where they intersect. If the thermal resistance requires extra layers of insulation, add layers to the bottom of the system changing the nailer direction as required so that the top nailer runs vertically up the roof slope.

*Multiple Layers: if the thermal resistance required extra layers of insulation, add layers to the bottom of the system changing the nailer direction as required. The top nailer must always run from the bottom of the roof slope to the ridge.

Step 4: Finish
Nail rood sheathing to nailers taking care that air movement is unobstructed in ventilation space.

Step 5: Roofing cover
Install roofing cover in accordance with manufacturer’s instructions. Adequate ventilation must be insured using an acceptable method to the applicable building code and/or local regulations.

For additional information on Cathedral ceilings, visit http://www.plastifab.com/applications/roofing/cathedral.html

No comments yet

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s

%d bloggers like this: